Site2site transfer new requirement - possible?

$
0
0

Hello,

 

I got a new requirement from our business department, in regards to this site2site transfer functionalities in ME 6.0.

In the source plant, we produce the SFC with some operations, and then transfer to the destination plant and continue several operations. I understand, this can be done with the transfer type SFC_CONSUME from the source plant material definition.

However, after the destination plant finishes those operations, the SFC should be transferred back to source plant as the inventory ID for the assembly station.

So the question is that, whether this is possible in the ME 6.0, to have the destination plant transfer back to source plant, and source plant can accept the SFC and automatically make it as inventory?? If not, what other possibility do we have?

 