Quantcast
Channel: SCN : All Content - SAP Manufacturing
Viewing all articles
Browse latest Browse all 1079

Re: Selecting ECC operation for scrapping from disposition

$
0
0

Hello Experts,

 

I am working on a case where the SFC can be sent to a disposition from one of the three operations. Here the SFC can be scrapped. When the NC of the SFC can not be closed here it is to be scrapped.

 

I have assigned necessary script to send to "Scrap". Now this scrapping has to take place with respect to one of the three operations from where the SFC has come to disposition.

 

In the disposition operation in step id, when I assign step id of one of the operations and scrap the SFC, it works well and SCF is scrapped with reference to this operation.

 

But how can we ensure that one of the operations can be selected? I tried assigning step ids of all three operations to disposition operation. System allows me save it. But when SFC is scrapped it still picks the first of the ids assigned.

 

Can some one guide me on this?

 

Thanks

 

Srinivas


Viewing all articles
Browse latest Browse all 1079

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>