Discontinued Material_Dependent Requirements

$
0
0


Hi All,

 

Material A (Discontinued) has been replaced with B (follow up), was updated material master with effective date 14.03.2014 and BOM with ECM for both.

 

'A' has zero stock, Last material movement for 'A' was happened on 13.03.2014.Mat 'B' is in use and getting correct requirement's.

 

Crux is, I still see the dependent requirements for mat 'A', not sure what could be the reson. I understand, if take MRP run (MD02) for 'A'; requirements will surely disappear.

 

Can somebody please tell the reason, why A is still having futured dependent requirements on MD04?

 

Many Thanks.

 

Refgards,

Deepak