Hi Experts,
My scenario is as follows,
I have two plants (ABC,XYZ) in ECC and two Sites (ABC, XYZ) in SAP ME. I have configured or run SAPMEINT CTC for Integartion of plant (ABC) in ECC and Site (ABC) in ME. Now I have cretaed another plant (XYZ) in ECC and Site (XYZ) in ME. I got couple of question here.
1. Can I use the same deployed SAPMEINT component for Integartion of Plant (XYZ) and Site (XYZ)?
2. If yes, what changes do I need to make in the cofigutration?
3. Do I need to re run the SAPMEINT CTC for Plant (XYZ) and Site (XYZ)?
What would be the better way in this scenario.
Thanks in advance,
Eshwar.