Hi All,
I am facing a problem in operation completion in ME. In my routing I have multiple operations where one operation contains list of BOM components (160+ Components). For all the components the backflash is checked in ECC and same is downloaded to SAPME. In SAP ME when I am completing the operation, it is taking 8 Sec time but I want to reduce the time as normal operation takes. When I am completing other operations, those are taking just 1 Sec.
As I understand system is checking all the components backflash for that particular operation in SAP ME before completion of that particular operation. Is there any way that I can stop the system to check the component backflash for all components.
Thanks in Advance
Chandan