Quantcast
Channel: SCN : All Content - SAP Manufacturing
Viewing all articles
Browse latest Browse all 1079

check time based configuration at start of operation

$
0
0

Hi

I need a solution to check the correct time-based-configuration at the start of an Operation, prior to the execution of the process.

We have MES 6.0.4.26.

 

The CT520 only checks configuration at complete (at start only for past operations).

 

I now of the check_resource_Setup Hook, which checks for a Setup. But using this, Operators would need to perform 3 Actions, each time, they change the configuration:

- Change Slot configuration

- load/replenish the resource

- AND book the resource Setup

 

This seems quite ineffective for me, and i suppose, will lead to mistakes, as Operators could easily leave out one of it.

 

 

Does anyone has a good idea, how to solve this?

Thx

Yvonne


Viewing all articles
Browse latest Browse all 1079

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>