HI All,
We need urgent help on yield confirmation. Standard work flow for yield confirmation from SAP ME, does not transfer operation time. This needs to be done through direct labor confirmation.
What is the way to trigger direct labor confirmation at the end of each operation which is defined as reporting step?
Is there any way to modify existing yieldconfirmation work flow to add operation time(start and complete time) through CO_BAPI_PRODORDCONF_CREATE_TT??
Request help on this as soon as possible.
Thanks!
Kedar