Hi experts,
I am using order based Scenario incl. relaxed Routing and material lot size = 200.
ME Process:
1. I release 200 pieces and I get one SFC number.
2. I start first SFC in POD.
3. I scrap 80 pieces. Remaining SFc qty is 120.
4. I release the next 200 pieces and I get 80 pieces for first SFC and second SFC with 120 pieces.
The result is that the first SFC is filled up with new released qty. Is there a possibility to stop that behaviour? I want to Keep first SFC with qty 120 and get a new SFC with qty 200.
Best regards,
Anke