Hello,
We are facing an issue with the change production in case of simultaneous route.
In case of non conformance SFC routing need to be replaced with the new route. In case of simultaneous route, after doing the change production it has kept the SFC in queue at all the operation instead of following the dependency/successor rules.
Please find the below screenshots and provide your feedback.
Before change production:
After Change production
Regards,
Kshitiz