Send SFC to disposition Routing and call back
Hi everyone, I am facing the following scenario trying to model a rework process for a customer: We have the product (SFC) being worked at one operation. If this SFC fails here, it is assigned a NC...
View ArticleME Inventory ID to ERP raw material serial/batch
Hi all, Our system is ME6.1 with ECC 6.0 ehp 6. using DRF and MEINT for integration I would like to have inventory IDs be created in ME when I do a 261 in ECC, each inventory ID would be a discrete raw...
View ArticleData collection
Hi This is about one check at the Data collection group Maintenance Allow missing check - only works for Data collection parameter TYPE Numeric & Text NOT for Boolean ?? any info if it work or...
View Articletool
Hi I have a situation - I start the operation and log the tool, tool status change to Productive, and I want the tool status should change from Productive to Enable when I log the NC to disposition...
View ArticleHow to pass current user credential for PAPI service execution
Hi All, As per my requirement I am using the SAP ME PAPI WS to start the SFC. I have used the SAPME PAPI Interface action block in ME within BLS and searched the service and operation also. Required...
View ArticleME15.03 Router transfer from ME to ERP with Change Management
Hi Everyone, I'm trying to transfer a router from ME 15.03 to ECC 6.06 with the system rule "Enable Replication of ME Routing to ERP" set to "Yes with Change Management" but I'm getting an error. In...
View ArticleScheduled Maintenance
Hi Experts, We schedule Maintenance for equipment for every 2 weeks. We create Plant Maintenance orders in SAP ERP. How to integrate this Plan with SAP ME? In Resource Maintenance, there are fields for...
View ArticleActivity Confirmation in SAP ME
Hi Experts, While doing completion of operation in SAP ME, the confirmation is getting posted in ECC. However, no activities such as machine/ labor time are getting posted with the operation...
View ArticleList All Secondary NC Codes
Hello experts, I am trying to list all secondary NC Codes for a parent NC Code with PAPI NCProductionServiceWSService. However, no matter I input there for the parentNC segment, all the values changed...
View ArticleSite-To-Site Webservice/PAPI
Is there a PAPI or Webservice that could be used to perform a site-to-site transfer? I found http://<server>:<port>/manufacturing-papiservices/SiteToSiteTransferServiceWSService but it...
View ArticleAssembly Qty As Required checkbox
Hi all, There is this requirement in our ME project to receive the Shop Order BOM with the checkbox Assembly Qty As Required checked for all of its components. I tried customizing the following part of...
View ArticlePCo 15 - OPC,SSCE and Websockets
I try to connect PCo-Websocket with SSCE-Dashboads, but it doesn't work =( If I create a Tag with the PCo-Simulator, it all works well. What I've done:I read the this guide :...
View ArticleME 6.0 Eclipse SDK supports NetWeaver 7.31.16 ??
HelloWe installed a new NetWeaver cluster, with one SCS/DB/Webdispatcher server and 4 App servers. The cluster seems working fine because I can use the SUM deploy the SAPME.sca and the manufacturing...
View ArticleIssue with Change Production for simultanous route
Hello, We are facing an issue with the change production in case of simultaneous route.In case of non conformance SFC routing need to be replaced with the new route. In case of simultaneous route,...
View ArticleBypass an optional operation
Hello, We have a business scenario like, the router we defined is OP1->OP2->OP3, and the OP2 is an optional operation, which means, when the SFC is completed at OP1, and the operator (and only...
View Articledeadlocked on lock resources with another process and has been chosen as the...
hi, We run SAPME version 6.0.4.46. the system now is very slow, I checked the trace file in application server and found this error that I attached as file.please can you help me to found the reason...
View ArticlePrice difference while cancel using co13
Hello guru, I am currently using discrete manufacturing scenario. and in that process i am producing jigs without BOM and ROUTING. i have made a dafault operation with work center using OPJG and i...
View ArticleOne question concerning Data Collection
Hi all, Today, when an operator do the manual assembly controlling, he is obligated to filled all the parameters of a DC group in one time. Operators want to be able to partially collect data for a DC...
View ArticleELAPSED_TIME_CHECK hook for different userIDs
Hello, We tried to use the ELAPSED_TIME_CHECK hook to control the elapsed time on one operation, but we realized the behavours are not fully expected. For example - ELAPSED_TIME_CHECK hook is...
View Article